A、inferior; compared
B、inferior; comparing
C、bad; compared
D、bad; comparing
正确答案:A
3、The woolen sweaters you delivered do not _____ the sample we provided.
A、like
B、as
C、match
D、fit
正确答案:C
4、I'm sorry to say the shipment didn't turn to _________
A、be satisfied.
B、be satisfying.
C、be satisfactory.
D、be satisfiction.
正确答案:C
5、We checked some of the items and found they were ______. 我们检查了部分产品,发现它们已严重受损。
A、in damaged condition
B、in damaged situation
C、severely damaged
D、damaged severely
正确答案:AC
6、【简答题】How can we make an EFFECTIVE Complaint or a Claim?
正确答案:Begin directly. Tell what is wrong.Present enough facts.Name specific actions to correct the problem.Politely mention strong terms if fail to get a satisfactory reply.End positively and friendly but firm.
9.5Sign the contract (签订合同)
1、We’ll sign two ____, each in the Chinese and English language.
A、originals
B、parts
C、sections
D、aspects
正确答案:A
2、This contract will _________ as soon as it is signed by two parties.
A、come into useful
B、come into available
C、come into valid
D、come into force
正确答案:D
3、The contract is _____ for two years.
A、affact
B、valid
C、effected
D、effective
正确答案:BD
4、请问我在哪里签名? 以下翻译正确的是:______
A、Where can I sign my name?
B、Where can I signature?
C、Where can I put my signature?
D、Where can I write down my signature?
正确答案:AC
5、The first shipment should be made at or before Oct.25th.
正确答案:X
6、【论述题】What qualities does the contractor should have?
正确答案:Be clear and generally accepted according to international practice;Be in conformity with rules and regulations in force in the countries concerned;Wording of the contract; Avoid typing errors, crossed-out words and word division;Use pens for signature.
10.1Conference prepation (会议准备)
1、What are not the necessary process during the preparation of a conference?
A、Confirm the size and location.