单项选择题
Total overhead variance is
A.the difference between actual overheadand budgeted overhead.
B.the difference between actual variableoverhead and budgeted overhead.
C.the difference between actual overheadcosts and overhead costs applied based onstandard hours allowed.
D.the difference between actual fixedoverhead and overhead costs applied.