单项选择题X 纠错
A.Who recommended the memory purchase?
B.Have more users been added since the memory purchase?
C.Why were additional CPUs not ordered at the same time as the memory?
D.Did a performance analysis of peak periods show a memory bottleneck?
你可能喜欢
单项选择题
A.Offer to rebuild the logical volume for a fee.
B.Offer to talk the customer through the procedure to rebuild the logical volume for a fee.
C.Suggest the customer open a call with IBM TechLine; offer to explain how the process works.
D.Suggest the customer open a call with IBM SupportLine; offer to explain how the process works.
单项选择题
A、Explain to the customer that they need an additional HMC for the POWER5 system.
B、Obtain a PO from the customer to purchase additional serial connections to the HMC.
C、Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.
D、Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
单项选择题
A.A minimum of two HBAs; the customer will need to download SDD
B.A minimum of four HBAs; the customer will need to download SDD
C.A minimum of two HBAs; the customer will need to configure MPIO
D.A minimum of four HBAs; the customer will need to configure MPIO
单项选择题
A、Install a p615 per application.
B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.
C、Install the appropriate solution once the requirements are understood.
D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.
单项选择题
A.What version of AIX is needed?
B.Which SWMA offering is needed?
C.What kind of network is the system being attached to?
D.What kind of memory should be configured on the system?
单项选择题
A.Have the PDU requirements been met?
B.Are there sufficient KVM connections?
C.Is there sufficient service clearance?
D.Is there sufficient space in the existing rack?
单项选择题
A.A four-port adapter is not supported.
B.The four-port adapter is a single point of failure.
C.There should be a spare port for each service IP label.
D.The four-port adapter could be a potential performance bottleneck.
单项选择题
A.Use an Inventory Services retrieval to show adapter features.
B.Retrieve previous eConfig proposals to see what others had shown.
C.Call the Account Executive to ask what the customer has used in the past.
D.Query the Supportline problem record database for the customer and LAN keyword matches.
单项选择题
A.p5-550
B.p5-520
C.pSeries p650
D.pSeries p630
单项选择题
A.Disk usage will increase in proportion to memory.
B.The new database will demand much more memory.
C.Memory demand will increase 10% for the next year.
D.Processor demand will increase about 10% for the next year.