你可能喜欢
单项选择题
A.AnyAIXbootablemedia,providingitisa64-bitvariant
B.AnyAIXbootablemedia,providingitisAIX5.1orlater
C.AnyAIX5.3bootablemedia,providingitisTL09orlater
D.AnyAIX6.1bootablemedia,providingitisTL02orlater
单项选择题
A.Utility allows for activation of resources by the hour. CUoD allows for permanent access to additional resources installed into the system.
B.Utility allows for permanent access to additional resources installed into the system. CuOD allows for activation of resources by the hour.
C.Utility allows for activation of resources by the minute. CUoD allows for permanent access to additional resources installed into the system.
D.Utility allows for a 30 day usage of additional resources installed into the system. CUoD allows for permanent access to additional resources installed into the system.
单项选择题
A.Dual power supplies.
B.Twice the amount of disk.
C.Two dual-port LHEA adapters.
D.Two dual-port fibre channel adapters.
单项选择题
A.When managing more than four VIO servers.
B.When installed with Power 570 and larger hardware.
C.When hosting both Linux and AIX on the same physical hardware.
D.When unexpected outage on a single HMC would prove an untenable risk for the hosted LPARs.
单项选择题
A.AIX Fix Central
B.IBM Developer Works
C.IBM Systems Software Information Center
D.IBM Systems Hardware Information Center
单项选择题
A.LPAR Planning Tool.
B.System Planning Tool.
C.LPAR Validation Tool.
D.System Validation Tool.
单项选择题
A.2
B.4
C.8
D.16
单项选择题
A.128MB
B.256MB
C.512MB
D.1024MB
单项选择题
A.PowerHA Standard Edition
B.PowerVM Standard Edition
C.Power6 Management Edition
D.Power6 Virtualization Edition
单项选择题
A.Virtualize network and memory to LPARs.
B.Virtualize network and storage to LPARs.
C.Virtualize memory and processors to LPARs.
D.Virtualize storage and processors to LPARs.