单项选择题X 纠错
A.Will the application require a database?
B.Which operating system does the application require?
C.Will the data need to be backed up in real time?
D.Does the application share data among the servers?
你可能喜欢
单项选择题
A.A DS4000 SAN with flash copy enabled for volume mirroring
B.An iSCSI solution with dedicated backup server with SCSI attached tape library
C.A NAS solution with SCSI direct attached tape library with dedicated backup network
D.A DS4000 SAN with fibre channel attached tape library solution with dedicated backup zone
单项选择题
A.Is the network capable of using 4x or 12x infiniband?
B.Will remote shell (rsh) be enabled for remote process initiation?
C.What are the data transfer requirements for inter-node message passing?
D.What type of data is being sent across the inter-process communication network?
单项选择题
A.How many web servers will be connected to the database?
B.Will the database be run on a Windows solution?
C.How many concurrent users will be accessing the database?
D.What are the types of transactions run against the database?
单项选择题
A.Add redundant Fibre HBAs to each server and direct attach them to a DS4300 Turbo SAN solution
B.Add iSCSI cards to the servers and direct attach them to a DS300 dual controller model
C.Use clustered NAS solution with redundant gigabit network connections
D.Add redundant Fibre HBAs to each server and attach them to a DS400 dual controller model
单项选择题
A.Is rack space an issue?
B.Is there a high cache-hit ratio?
C.Is this a mission-critical application?
D.Are there plans to expand the memory to 8GB in the future?
单项选择题
A.Implement one DS4400 at each location connected to the fibre link and use Remote Volume Mirror (RVM).
B.Implement a DS4400 at each location using FlashCopy option and use host based replication to synchronize the sites.
C.Implement a switched fabric using redundant SAN switches with a DS4300 using RVM option at each location.
D.Implement a switched fabric using SAN switches connected via ISL with a DS4300 using RVM option at each location.
单项选择题
A.Have optional Fibre Channel and Ethernet switches been installed in the server?
B.What is the available kVA value of the UPS?
C.Are there sufficient empty socket outlets in the UPS?
D.What is the impact on the power consumption of the data center cooling system?
单项选择题
A.Three x366 4-ways running VMWare ESX Server.
B.An x445 8-way Xeon MP attached to a DS4300 and running VMWare ESX Server.
C.An x445 16-way Xeon MP attached to an EXP400 and running VMWare ESX Server.
D.Four x346 2-ways running VMWare ESX Server.
单项选择题
A.The application should be tested and baselines should be measured with simulated user loads.
B.The application should be tested with the minimum amount of memory then increase the memory in increments until an acceptable response is achieved.
C.The application should be tested with differing amounts of memory and the fastest response time is reached it should be used as the acceptable configuration.
D.The application should be tested with the maximum amount of memory then decrease the memory in increments until an acceptable price/performance ratio is reached.