单项选择题X 纠错
A.The customer is looking for a fibre SAN solution to increase reliability and performance.
B.The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.
C.The customer is cost-conscious and is looking for a centralized storage solution.
D.The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
你可能喜欢
单项选择题
A.EXP3000 Local Attached Storage Enclosures
B.DS4000 Series storage solution
C.DS3000 Series Storage solution
D.DS4800 Storage Solution
单项选择题
A.SteelEye for optimal performance.
B.Integrated Tape Drives for backup.
C.Software Distribution Premium Edition.
D.IBM TotalStorage DS3000/DS4000 for a shared disk environment.
单项选择题
A.If you do not offer it, IBM or someone else (perhaps your competitors) will.
B.Protects the end user in the event there is a service issue.
C.Protects the Reseller in the event the end user has a service issue.
D.all of the above
单项选择题
A.IBM ServicePacs remove a liability from you the reseller in the event of fire
B.IBM ServicePacs remove a liability from you the reseller in the event of flooding
C.IBM ServicePacs provide improved warranty coverage
D.Service just adds a layer of cost you do not need
E.all of the above
单项选择题
A.DLTV4 internal drive
B.GoVault backup drive
C.LTO3 library using one drive
D.LTO3 Autoloader using one 400 GB cartridge
单项选择题
A.A DS3000 iSCSI-based solution.
B.One MegaRAID 8480 card with 4 EXP3000 units.
C.An N3700 network attached solution.
D.A DS6000 Fibre Channel solution with EXP710 expansion units.
单项选择题
A.Do not quote any additional services.
B.Add a tape device as an option to the quote.
C.Ask for a special bid to lower the total price.
D.Just quote exactly to the customer’s specification.
单项选择题
A.1 x 8 console switch
B.2 x 16 console switch
C.2 x 8 Local Console Manager 2
D.2 x 16 Global Console Manager 2
单项选择题
A.Disk space
B.Memory
C.Extra Power supplies
D.CPU speeds