单项选择题X 纠错
A.Its IP address already exists.
B.It is operating normally.
C.It requires a code upgrade.
D.It has lost contact with the controller.
你可能喜欢
单项选择题
A.Posture validation has not been enabled.
B.The AAA server is set to accept both MS-CHAP v2 and GTC for PEAP authentication.
C.Clients and server are not using certificates.
D.Clients have been set to validate the server identity.
单项选择题
A.3
B.6
C.4
D.1
单项选择题
A.Create a more effective sales strategy for partners.
B.Reinforce customer confidence in partners selling products.
C.Provide a consistent, repeatable, and proven method to ensure the network solution that is deployed delivers upon the customer’s goals for reliability and availability.
D.Maximize the number of services required to support advanced technologies.
E.More clearly define the roles of account managers, systems engineers, and field engineers.
单项选择题
A.The client card is not associated to the network.
B.The client card has awakened from power-save mode.
C.The driver has been installed incorrectly.
D.The client card has failed.
单项选择题
A.55 percent
B.75 percent
C.40 percent
D.25 percent
单项选择题
A.ensure channels are deployed such that they do not overlap
B.allow for the automatic containment of rogue access points
C.ensure each area is covered by a minimum of three access points
D.ensure a minimum RSSI value of -50
单项选择题
A.4
B.32
C.8
D.16
单项选择题
A.All four ports from the Cisco WLC terminated to the same Catalyst gigabit module and channelgroup.
B.Ports 1 and 2 from Cisco WLC to Catalyst gigabit module slot 1 channel group 10 and CiscoWLC ports3 and 4 to Catalyst gigabit module slot 2 channel group 10.
C.All four ports from the Cisco WLC terminated to the same Catalyst gigabit module using two channel groups.
D.Ports 1 and 2 from Cisco WLC to Catalyst gigabit module slot 1 channel group 20 and CiscoWLC ports 3 and 4 to Catalyst gigabit module slot 2 channel group 40.
单项选择题
A.50 feet [15 meters]
B.200 feet [60 meters]
C.150 feet [45 meters]
D.100 feet [30 meters]