单项选择题X 纠错

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

A.activity
B.procedure
C.process
D.progress

参考答案:
查答案就用赞题库小程序 还有拍照搜题 语音搜题 快来试试吧
无需下载 立即使用

你可能喜欢

赞题库

赞题库-搜题找答案

(已有500万+用户使用)


  • 历年真题

  • 章节练习

  • 每日一练

  • 高频考题

  • 错题收藏

  • 在线模考

  • 提分密卷

  • 模拟试题

无需下载 立即使用

版权所有©考试资料网(ppkao.com)All Rights Reserved