A.unit method B.block method C.straight method D.package method
A.Fetch B.Take C.Bring D.Let
A.Tanks for the storage of drinking water B.Ballast tanks to prevent the boat from capsizing C.A hydraulic start diesel engine D.Auxiliary mechanical propulsion (Fleming gear)
A.one white light B.two vertical white lights C.one yellow light D.two vertical yellow lights
A.In due course B.On time C.In time D.Swiftly
A.only when the cargo is within its rail B.after the cargo is checked by tallymen C.as soon as the cargo loading or unloading begins D.during the time when loading or unloading is going on
A.frequent opening of hatches to permit entry of fresh air B.regular checks of bilge levels C.use of ear plugs to dampen engine noise D.frequent flushing of the water spray system with fresh water
A.decelerating when lowering the load B.decelerating when raising the load C.lowering the load at constant speed D.raising the load at constant speed
A.in B.up C.over D.with
A.horizontally banded buoys B.vertically striped buoys C.yellow buoys D.spherical buoys