A.the mess room B.each lifeboat C.each industrial work site D.each fire station
A.using a rotary grinder with an installed shield B.letting go the anchor C.handling wire rope or natural fiber line D.painting with a spray gun
A.a turn around a forward thwart with a toggle pin thru the eye B.a knot around a thwart C.an eye splice placed over one of the hooks of the releasing gear D.All of the above
A.week B.month C.crew change D.other week
A.Frapping line B.Tricing line C.Rottmer release D.Winch remote control wire
A.Carbon dioxide B.Water (stored pressure) C.Dry chemical D.Foam
A.grooved wheel in a block B.line to hold a lifeboat next to the embarkation deck C.partial load of grain D.seaman's knife
A.three months B.six months C.twelve months D.eighteen months
A.End-for-ended B.Renewed C.Inspected D.Weight tested
A.fire-main system B.feed-water system C.freshwater sanitary system D.domestic water tank