单项选择题

Two common methods of drawing progress network are两种常用的进度网络绘图方法是()。 A.
Aticivity on node method(AON) and Atitivity on arrow method (AOA) 节点法与箭线法 B.
Aticivity on node method(AON) and Conditional diagramming methods 节点法与条件图法 C.
Aticivity on node method(AON) and Logical bar chart method      节点法与逻辑横道图法 D.
Aticivity on node method(AON) and Precedence Diagramming Method (PDM) 节点法与前导图法

题目列表

你可能感兴趣的试题

问答题

The abbreviation of PDS is [填空1]

答案: 1、
微信扫码免费搜题